|
Dowson Primary School had a major problem with reverberated
noise in the Hall and Corridor areas, the contractor was tasked
with finding a solution at a very reasonable price as the
building had just been completed and funds were obviously
limited. The building, being of a metal and concrete structure
together with use of a hard surface on the floors, created
unacceptable amounts of echo and reverberated noise.
After the recommendation of an independent sound engineer
Classmate was proposed. Winton Flooring of Prestwich, Manchester
carried out the installation and the headteacher, staff and
pupils are delighted with the result.
Classmate had the added benefit of being VelcroŽ friendly
eliminating the need for adhesives or drawing pins to attach
artwork etc. |